CEB Cabin Infrastructure 90% Complete

We hope you all had a Merry Christmas and will have a prosperous and Happy New Year!

We have been hard at work during November and December getting all the dirt work and infrastructure complete for the new Compressed Earth Block (CEB) cabin. We’ve trenched and installed the electrical conduit, water line, and septic tank connections. Now we are waiting for our electric company to install the meter and hook up the service side. At that point, we will have all utilities available to the new CEB Cabin. Unfortunately, I had forgotten to install the conduit for the internet. So that is still on the to-do list.

Here are some pictures of the work we have been doing.

Preparing the base for the electrical meter base
We are preparing the pad for the electrical transformer.
Stem walls with water proof membrane being applied
Stem walls with the waterproof membrane being applied
Backfilling the stem walls
Backfilling the stem walls
Electrical conduit to the cabin
Electrical conduit to the cabin
Septic Install
Septic Install