Finish out begins.

With the water and electrical infrastructure in place, and the walls, electrical, and plumbing installed. It is now time to start the interior finish out. We have installed green certified sheet rock. We hand cut all the joints and electrical box openings. We also applied the skip trowel texture entirely by hand. Our choice of paint was the same low VOC paint we used in our last house. Its something we could both agree on.