Infrastructure Done
The dirt work is completely done. All utilities have been run to the Stabilized Compressed Earth Block (CEB) cabin. This includes water, electrical and internet. We are now in full production of the blocks. Wall Section This is a sample of the proposed wall section. There will be an outside
CEB Cabin Infrastructure 90% Complete
We hope you all had a Merry Christmas and will have a prosperous and Happy New Year! We have been hard at work during November and December getting all the dirt work and infrastructure complete for the new Compressed Earth Block (CEB) cabin. We’ve trenched and installed the electrical conduit,
Testing Compressed Earth Block (CEB) Production
We have started testing block production using the Hydraform M7 Compressed Earth Block Machine. Since we don’t really have “dirt” here, (only dirty rocks), we have decided to follow the lead of my friend Brandon Gore. He used crushed limestone fines as a substitue for dirt. So we have settled
Compressed Earth Block Cabin Foundation is Complete
We have been working hard on the foundation prep and pour for our new Compressed Earth Block (CEB) cabin. The plumbing stub out had to be completed prior to the final slab pour. Hopefully, this will be the worst task during the CEB cabin build. While my good friend Vince
Groundbreaking for the Stabilized CEB Cabin
Ground breaking on cabin 3 has begun. This last week we have been working on removing trees and shaping the lot to prepare for pouring the foundation for cabin 3 (stabilized CEB cabin). The original design was to take out part of the hill and move the dirt forward to
Finish out update
Front Door Petrified Wood Sink Shower Locally sourced Black Walnut for the countertops.