Getting the Deck Up

November 19, 2017 Blog  No comments

Setting the vertical piers and bracing them for the runners.

Setting the vertical piers and bracing them for the runners.

After the pads were poured and cured.  An 8″ double galvanized pin was countersunk into the pad and the bottom of the treated 8×8 pier.  These were plumbed and braced.  Dual 2×12 runners were attached to the piers from front to back.  Then the 2×10 floor joists were attached to the runners on 16 in centers.

 

Transformer set and hot.Meter base wired and set. Ready for service.

Runners on Pad Site 2

Floor Joists on Pad 2

Floor Joists on Pad 1

 

During this time Buck trenched and set the conduit for the electrical and the water to the end of the ridge.  Two more transformer pads were built for the future “family cabin”. 

Meter base wired and set. Ready for service.

Meter base wired and set. Ready for service.

 

Transformer set and hot.

Transformer set and hot. We got the power!