Finish out begins.

March 1, 2015 Blog  No comments

With the water and electrical infrastructure in place, and the walls, electrical, and plumbing installed. It is now time to start the interior finish out. We have installed green certified sheet rock. We hand cut all the joints and electrical box openings. We also applied the skip trowel texture entirely by hand. Our choice of paint was the same low VOC paint we used in our last house. Its something we could both agree on.

Make sure you click Read More.

Sunrise

Sunrise

living room from office

living room from office

Bear loves the shower before the water is connected

Bear loves the shower before the water is connected

Paint going on in the bedroom

Paint going on in the bedroom

Bedroom

Water Heater

Water Heater

Office living room

Leave a reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>