Monthly Archives June 2018

Dryed in, Finish-Out started

June 17, 2018 Blog  No comments

We now have the roof on.  It was quite difficult because my harness was made to catch you in the event of a fall.  The clip was designed to be in the back.  Notice the belt on my back to hold the harness together.  We had to retrofit it backwards so we could repel down the roof and pre-drill the holes and then screw it down.  In order to do this you had to support your weight with one arm while you worked with the other.

Skylight installed.  I only cut my forearm once on the edge of the roof getting it to the top.  #superglue

Interior after sheet rock, texture, paint, and fixtures.

Interior looking over the deck to the view.

Kitchen, Bar area, and front door.

This is a sink I found for the bathroom.  It carved out of a petrified wood tree log.  It is stunning.

This a google earth pho...

Read More