Wall Panels, Window Panels, Door Panels, Oh My!

During the inclement days the 20 wall panels are being fabricated.  The sides of each panel is cut at a 9 degree angle to account for the curvature of the yurt.  We are doing 4 picture windows (3.5 feet by 6 feet tall) and a double hung window in the bedroom, bathroom and the kitchen.  So we have 7 window panels, 1 door panel and 12 solid panels.

Fixed Window Panel
Fixed Window Panel
Prepping wall panel with outer cedar cut with tongue and V grove underneath.
Prepping wall panel with outer cedar cut with tongue and V grove underneath.
JT adding the western cedar outer sheathing.
JT adding the western cedar outer sheathing.

Notice the bottom cedar sheathing has 2 finish screws on each side.  This is so that after the panels are set, the piece can be removed so flashing can be installed so water will not wick up the panels.

 

Finished Solid Wall Panel
Finished Solid Wall Panel
Window Panel
Window Panel

Getting the Deck Up

Setting the vertical piers and bracing them for the runners.
Setting the vertical piers and bracing them for the runners.

After the pads were poured and cured.  An 8″ double galvanized pin was countersunk into the pad and the bottom of the treated 8×8 pier.  These were plumbed and braced.  Dual 2×12 runners were attached to the piers from front to back.  Then the 2×10 floor joists were attached to the runners on 16 in centers.

 

Transformer set and hot.Meter base wired and set. Ready for service.

Runners on Pad Site 2
Floor Joists on Pad 2
Floor Joists on Pad 1

 

During this time Buck trenched and set the conduit for the electrical and the water to the end of the ridge.  Two more transformer pads were built for the future “family cabin”. 

Meter base wired and set. Ready for service.
Meter base wired and set. Ready for service.

 

Transformer set and hot.
Transformer set and hot. We got the power!

Double Your Fun ….

Finally, work has been done on building 2 new yurts.  These yurts will be 25″ across and be about 475 sq feet of living space.  This time around we decided to buy 2 roof kits as opposed to the complete kit.  By purchasing on the roof kits only, we could get 2 delivered on one truck saving in shipping.  Also, I had to buy 2 roof kits to get the roof metal in any color other than silver.  We received the roof kits in April of this year.  We then had to save up some “scratch” and wait for my helpers Gator and JT to free up from previous commitments.

 

This is pad site 2 before any dirt work had been done.

I had Buck put in a circular drive and pad sites for both pad 1 and pad 2.

This is pad 1 when finished.

Pad Site 2
Pad Site 2

We then had to start laying out the pads for the piers and start the monumental task of drilling the piers.  This lasted about 30 minutes…. Then the call went out to Buck to bring out his hammer to break up the limestone shelf so we could try to auger the holes.

After the the holes were positioned and dug, forms were built, secured and leveled.  This took about 2 weeks.

After the forms were in place we poured 8 yards of concrete.  The truck could reach about 4 or 5 of forms.  After that, it was on JT’s back (literally) to wheelbarrow the concrete from the truck to the forms.  This was a long day!

Pad site 1

Pad Site 2